01 / Inspection first
We measure paint depth, map defects, and record panel temperature before a single layer goes on. Preparation is the variable we control. The coating only holds what the surface allows.
Ceramic coating is not scratch-proof and never replaces paint protection film. Quotes are indicative until inspection.
03 / Driving conditions
Salt, sun and stone chips damage clear coat in different ways. Each row names the preparation step that must be finished before any coating is applied, and the package logic that follows. Indicative pricing only, final quote after inspection.
| Driving condition | Window | Preparation requirement | Package logic |
|---|---|---|---|
| Winter road salt and brine Corrosion risk | Nov to Mar, city and highway | Full decontamination, wheel arch and sill rinse, panel temperature log before coating | Two-layer coating with an annual inspection |
| Summer UV and tree sap Fade risk | May to Sep, parked outdoors | Correction of oxidised panels, IPA wipe, cure window kept in shade | UV-stable top coat, quarterly wash routine |
| Gravel and broken asphalt Impact risk | Year-round, regional roads | Chip mapping under inspection lamp, edge masking on bumper and hood lip | Coating plus paint protection film, never coating alone |
| City parking and tight courtyards Contact risk | Year-round, open car parks | Panel gap wipe-down, trim masking check, full gloss reading before handover | Maintenance plan with a six-month inspection |
Coating is not scratch-proof and does not replace paint protection film.
See how each row maps to a package03 / Surface preparation
Each stage is logged on the inspection sheet. Skipping one shortens coating life, usually to the first salted winter.
Request an inspectionPaint depth readings plus a map of every repaired or repainted panel. This record decides how much correction the clear coat can take.
Tar, iron fallout and old wax removed through a two-bucket wash, iron remover and clay. City brake dust and winter salt film both surface here.
Machine polishing clears wash marks and swirls. We stop at the level that keeps remaining clear coat above the safe margin.
Surfaces are wiped with isopropyl alcohol and read with an infrared gauge. Coating goes on only inside the stated temperature window.
Layers applied by hand under fixed studio lighting, with a defined flash time per panel before leveling.
Twelve hours of dust-free cure, then a seven day water-free window. Your written quote carries the exact cure schedule and package tier. Compare package tiers.
04 / Package comparison
Every line is settled at inspection, not at checkout. Paint readings decide the conditional cells.
Compare packages in full| Included step | Essential | Signature | Full Front |
|---|---|---|---|
| Decontamination wash | Yes | Yes | Yes |
| Machine paint correction | If needed | Yes | Yes |
| Panel temperature log | Yes | Yes | Yes |
| IPA wipe before coating | Yes | Yes | Yes |
| Ceramic coating | Yes | Yes | Yes |
| Wheel face coating | No | Yes | No |
| Front paint protection film | No | No | Yes |
| Annual warranty inspection | Yes | Yes | Yes |
Conditional cells follow paint depth readings taken during the inspection. Full warranty terms are issued with the written quote.
05 / Limitations
A coating is a sacrificial layer, not armour. We set the expectation before the car is booked, because preparation only pays off when the owner knows the limits.
Not scratch-proof
A hardness rating describes resistance to light marring, not immunity. Grit in a wash mitt, a brush at a self-serve bay or a keyed panel will still mark the clear coat. Wash discipline matters more than the coating label.
Not a replacement for paint protection film
Stone chips, gravel from road repairs and impact damage need a urethane film with real thickness. Coating covers the surface, film absorbs the strike. On a daily-driven car we usually recommend film first on impact zones, coating over the rest.
Not a permanent finish
Winter salt, tar and de-icing residue shorten service life. Warranty conditions depend on the maintenance and inspection schedule written into your quote.
See how film and coating are weighed side by side in the package comparison, or request an inspection and we will say what your paint actually needs.
05 / Evidence
Every plate records the numbers we log before the coating bottle is opened. If a panel reads outside the window below, that panel waits.
Request an inspection
Plate 01 / Bonnet, corrected
Plate 02 / Coating bay log
Readings are taken with an infrared gauge at three points per panel and written into the job sheet, which you receive at handover.
07 / Contacts